EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
wlawrence
-
Listing for Category : project sale
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (407)
Introduction
- (1)
Avionics
- (8)
Baffling
- (12)
Canopy
- (40)
Controls
- (15)
Cowl
- (32)
Dialogue
- (3)
Documentation
- (5)
Empennage
- (1)
Engine
- (95)
Firewall
- (2)
Fuel System
- (27)
Fuselage
- (19)
Glare Shield
- (5)
Inspection
- (1)
Instrument Panel
- (18)
Interior Finish
- (5)
Landing Gear
- (11)
Lighting
Paint / Decals
- (1)
Presentation
- (1)
Project Sale
- (1)
Propeller
- (2)
Research
- (1)
Tail Feathers
Tools
- (1)
Various
- (13)
Windscreen
- (16)
Wings
- (34)
-
"Hero"...
-
"Hero"...
-
Dings, fairing strips
-
Wing walk, wing...
-
Trim, wing walks
-
Wings on and pinned
-
Wings on, sort of
-
Finished tie down
-
Mods to make it...
-
Complete Hinge Pin...
-
Finish Deburring...
-
Finish Drilling and...
-
Drill And Cleco Left...
-
Connect Aileron linkage
-
Compete Flap Rigging...
-
Rig Wing Flaps
-
Retrieve Flaps and...
-
Trim L/H Wing...
-
Trim Wing Doubler
-
Fit Wings to Fuselage
-
Work On Securing...
-
Work On Securing...
-
Continue Work On...
-
Work On Securing...
-
Wing Flap Piano...
-
Take Measurements Of...
-
Continue Effort to...
-
Aligning Bolt Holes...
-
Install Wing Spars...
-
Ream Wing Anchor...
-
Install Wing Rib
-
Wing Rib
-
Remove Wing Inner Rib
-
Wing Tips
Workshop
- (9)
Ignition
- (28)
Builder Name:
William Lawrence
-
Project:
Sonex
-
VIEW REPORTS
Total Hours:
1884.3
Total Flight Time:
Start/Last Date:
Nov 21, 2018 - No Finish Date
Engine:
Aerovee
Friendly URL:
https://eaabuilderslog.org?s=wlawrence
Home or Last Project Picture
Aug 21, 2021
Moving Day
- (12 hours)
Category: Project Sale
I am pleased to report that the EAA Chapter 393 Don Baldwin Sonex project has been purchased by fellow chapter member Ryan Young. Today the wings were removed and the project was loaded into a Uhaul truck and moved to its new home.
Ryan rolls the wings out
Pulling the right wing
Lee disconnects Air Data
Ryan and the wings
Wings secured in the cradle
Ramps are 2 x 12s
Lee ties it all down
Hrzntl Stab too wide
We clamped the door in place
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.